Important: Our geodesic domes are custom-manufactured products requiring specialized delivery and installation. Please read this policy carefully to understand our delivery process and timelines.
1. Manufacturing & Delivery Timeline
1.1 Standard Production Timeline
- Manufacturing time: 4-6 weeks from deposit confirmation
- Quality inspection: 3-5 business days
- Delivery preparation: 2-3 business days
- Installation scheduling: Coordinated with customer
Total estimated time: 5-8 weeks from order confirmation to installation completion
1.2 Factors Affecting Timeline
Delivery timelines may be extended due to:
- Custom specifications or modifications
- Material availability for specific finishes
- Weather conditions (cyclone season: November-May)
- Site accessibility and preparation delays
- Building permit processing times
- Peak season demand (December-February)
2. Delivery Coverage
2.1 Delivery Zones in Mauritius
Zone 1: Standard Delivery (Included)
All accessible areas in Mauritius including Port Louis, Curepipe, Quatre Bornes, Phoenix, Rose Hill, Vacoas, Flic en Flac, Grand Baie, Pereybere, Trou aux Biches, Mont Choisy, and major coastal areas.
Zone 2: Remote Areas (Additional Charges May Apply)
Mountainous regions, private estates, offshore islands (Ile aux Cerfs, Ile aux Aigrettes, etc.), and locations requiring specialized transport.
Zone 3: Special Access Locations (Quote Required)
Sites requiring boat transport, helicopter delivery, or locations with restricted vehicle access.
2.2 Site Accessibility Requirements
Your installation site must meet these requirements:
- Vehicle access: Minimum 3-meter-wide access road for delivery truck
- Foundation readiness: Prepared foundation/base as per specifications
- Clear workspace: 10-meter radius around installation area
- Utilities access: Available if electrical/plumbing features ordered
- Permits obtained: All required building permits in place
3. Delivery Process
3.1 Pre-Delivery Coordination
- Site inspection: Our team conducts pre-delivery site visit (2-3 weeks before delivery)
- Delivery scheduling: We contact you 7-10 days before delivery with confirmed date
- Confirmation call: 48-hour advance notice confirming delivery window
- Final check: 24-hour reminder and final coordination
3.2 On Delivery Day
- Our delivery team arrives during the scheduled 4-hour window
- Components are unloaded and inspected together with customer
- Customer must sign delivery acceptance form after inspection
- Note damages immediately - claims must be made on delivery day
3.3 Installation Service
Professional installation is included with all dome purchases:
- Installation begins immediately after delivery (weather permitting)
- Typical installation time: 2-5 days depending on dome size and features
- Our certified installation team handles complete assembly
- Final walkthrough and handover upon completion
4. Delivery Charges
4.1 Standard Delivery
- Zone 1: FREE delivery and installation included
- Zone 2: Additional MUR 5,000-15,000 (quoted based on location)
- Zone 3: Custom quote required
4.2 Additional Charges (If Applicable)
- Site preparation assistance: MUR 10,000-30,000 (if foundation not ready)
- Crane rental: MUR 15,000-40,000 (for sites requiring crane access)
- Expedited delivery: 20% surcharge for rush orders (subject to availability)
- Rescheduling fee: MUR 5,000 if customer reschedules confirmed delivery
5. Customer Responsibilities
5.1 Before Delivery
Customers must ensure:
- Building permits obtained and approved
- Site prepared and foundation ready (specifications provided)
- Access road clear and accessible for delivery vehicle
- Utilities available if ordered (electricity, water)
- Designated representative available on delivery day
- Final payment completed (or payment plan up to date)
5.2 On Delivery Day
- Be present or designate an authorized representative (18+ years)
- Provide safe workspace for installation team
- Inspect all components before signing acceptance form
- Report any visible damage immediately (same day)
- Ensure pets are secured and away from work area
6. Delivery Issues
6.1 Damaged or Missing Items
If you discover damage or missing components:
- Immediate reporting: Note damages on delivery form before signing
- Photographic evidence: Take clear photos of any damage
- Contact us immediately: Call +230 5883 2400 or email hello@domeguysmauritius.com
- Claim timeline: Damage claims must be filed within 24 hours of delivery
- Resolution: We will replace damaged parts at no cost (if reported timely)
6.2 Delivery Delays
If delivery is delayed due to:
- Company delays: We will notify you immediately and provide new timeline
- Weather/force majeure: Timeline extended, no penalties or refunds
- Customer delays: Storage fees may apply (MUR 2,000/week after 2 weeks)
- Site not ready: Delivery postponed, rescheduling fee applies
6.3 Failed Delivery Attempts
If delivery cannot be completed due to customer issues:
- 1st attempt: Rescheduled at no additional charge
- 2nd attempt: MUR 5,000 rescheduling fee
- 3rd attempt: MUR 10,000 rescheduling fee + storage fees
- After 30 days: Order may be cancelled, deposits non-refundable
7. International Shipping
7.1 Regional Islands (Rodrigues, Réunion, etc.)
- Availability: Yes, we ship to regional Indian Ocean islands
- Shipping cost: Custom quote based on destination
- Timeline: 8-12 weeks (includes customs clearance)
- Installation: May require customer-arranged installation (we provide detailed instructions)
- Customs/duties: Customer responsible for all import fees and taxes
7.2 International Orders
For orders outside Mauritius and regional islands:
- Contact us for feasibility assessment
- Freight forwarding arranged case-by-case
- Installation services not included (instructions provided)
- Warranty support available remotely
8. Weather & Seasonal Considerations
8.1 Cyclone Season (November - May)
- Deliveries may be postponed during cyclone warnings (Class 2 and above)
- Installation paused during adverse weather
- Timeline extended accordingly - no penalties
- Safety of team and product is our priority
8.2 Rainy Season
- Installation may take longer in wet conditions
- Foundation work requires dry weather
- We recommend scheduling deliveries during dry season (May-November) when possible
9. Post-Delivery Support
9.1 Installation Completion
Upon installation completion:
- Full walkthrough with customer
- Care and maintenance instructions provided
- Warranty documentation delivered
- Customer signs installation acceptance form
- Final payment due (if applicable)
9.2 Follow-Up & Warranty
- 7-day check: We contact you to ensure everything is satisfactory
- 30-day inspection: Optional free inspection and adjustment
- Warranty period: See our Terms of Service for warranty details
- Ongoing support: Available via phone, WhatsApp, or email
=æ Pro Tip: Smooth Delivery Checklist
2 weeks before delivery:
- Confirm foundation is complete and cured
- Clear delivery access road
- Obtain all building permits
1 week before delivery:
- Confirm utilities are ready (if ordered)
- Prepare workspace (remove obstacles, secure pets)
- Complete final payment
On delivery day:
- Be present or designate authorized representative
- Inspect all components carefully
- Take photos if any concerns
10. Contact for Delivery Coordination
Dome Guys (Mauritius) Ltd
Delivery Coordination: hello@domeguysmauritius.com
Phone: +230 5883 2400 | +230 5250 3420
WhatsApp: +230 5883 2400
Hours: Monday-Friday 8:00 AM - 5:00 PM, Saturday 9:00 AM - 1:00 PM
VAT: 27621190